Location: Auckland

In late 2019, Electrix’s gas group was awarded a contract from Vector to maintain a 200mm diameter steel gas pipe under the Auckland Harbour Bridge.

Connecting the North Shore to the Auckland CBD, this pipeline is a critical component of Auckland’s gas network.

The work has involved the team replacing 127 brackets on the pipeline and inspecting, repainting and reporting all corrosion on panel points located under the spans on the bridge. 

Brackets on the Auckland Harbour Bridge.